Design and Build Contract
Background
- New heating, air conditioning and integrated building management
system
- Christie’s headquarters London St James’s
- Auction & viewing rooms-North Room, Blue Room, Ryder Room
- Direct expansion heat pump air conditioning units
- Concealed ducted units
- Oil fired heating system converted to gas using two new 206 Kw
boilers
- Boilers provided heating for radiator network and heated ventilation
system
- Group controlled and linked to integrated building management
system
Approach
- All work performed outside of normal hours to maintain business as
usual
- Services were designed to match the existing décor with all grilles to
blend with original Victorian ceiling features
- Fast track project
Benefits
- Minimal disruption to clients business
- Cost savings engendered on running cost of plant
- Business needs of the client clearly understood
- ISS Building Services support the site by resident site maintenance
engineers with in-depth knowledge of site services