Design and Build Contract

Background

  • New heating, air conditioning and integrated building management system
  • Christie’s headquarters London St James’s
  • Auction & viewing rooms-North Room, Blue Room, Ryder Room
  • Direct expansion heat pump air conditioning units
  • Concealed ducted units
  • Oil fired heating system converted to gas using two new 206 Kw boilers
  • Boilers provided heating for radiator network and heated ventilation system
  • Group controlled and linked to integrated building management system

Approach

  • All work performed outside of normal hours to maintain business as usual
  • Services were designed to match the existing décor with all grilles to blend with original Victorian ceiling features
  • Fast track project

Benefits

  • Minimal disruption to clients business
  • Cost savings engendered on running cost of plant
  • Business needs of the client clearly understood
  • ISS Building Services support the site by resident site maintenance engineers with in-depth knowledge of site services